Manicure the placement. Set up the teir down garden along side. Side deck on the floor.(floating deck.)
Hallway connects to the side. Mount correctly. Make sure it doesnt sag. Have the underneather still accessible for lawn maintenance.

Put on the new siding the second week to keep everything uniform after placement.

only takes 2 trucks. 15 hours total setup time.   The tank is a 3 day job on the allocation sheet. Your going to have to remove the tank for the other one anyway. Second one behind the tank mounts directly to the florida room. Should be a direct bolt on. Steel the frame for the deck. Non slip. make the walkway pretty.

Siding is about a week or 2.  Afte that they'll be out of your hair.
Its an L.

3rd week bring in the pavers for the driveways. even smooth.  Should be around the same time the siders are finishing.
Image result for paver styles

don't forget the drainage for winter conditions. Its a seperate order. Should be ona pallet. Drain is for winter. Goes straight to the gutter.

Image result for Gutter drainImage result for Gutter drainmake sure its hidden.no ditch. Even with surface. little ditch. Not enough to fuck the car up. 45 degree slope 3 ft down max.


Image result for Flower bouquet boquets inside. Formal shit.

The garden in the back. Lay the new stuff. for the water drainage and put the new style fence to this region to avoid decomposition. Lumber here has a high degradation rate for some reason.Image result for Fence styling gardenImage result for Robot lawn mower

========================================================
Image result for gift basketsImage result for weed

========================================================

Keep the glass door. Not glass plexi. For weather.
less than a day installation. Attaches undeathe the seacond eddition L on the left from street. Keep the walk over. to the rear. Both need replacing.


Image result for Boat garageImage result for hallway house outsideRelated imagehallway should be this stupid.


Image result for solar power shingles

3rd month send in the roofer for the new system. Fence it after that.  Everything should be done.

Image result for gate leave the walkway to the street door.

thats it for that one.

Allocation time card is less than 6 months for everything.

replace the windows on it also.


you know the rule. Leave no trace afterward. Natural element. Shouldnt even look like it was touched.


Image result for gateImage result for Snow plow robot

never see through.


throw out the houses furniture. hand craft everything. Its apart of someones race. or just order my shit from the mass production line. Atleast my shit is mine.

new beds. New seats.

thats it for that one. close that case.


leave it on the kitchen table when your done.

Image result for white yukataImage result for silk bagyukatta in bag. undneathe box. Image result for white blanketbeside the box.  long enough for the body. 



leave the traditional rifle in the case also.

Comments

Popular Posts